2.3km of Multi Use trail running from the BC Ferries terminal in Village Bay to the Miner's Bay Village. Ramida is working with CRD Parks and Engineering to create a sustainable piece of Mayne Island infrastructure.
Contracted to Corrections Canada to replace in service sanitary sewer manholes and install Cure-In-Place-Pipe lining of sanitary sewer lines.
Contracted to Heatherbrae Buiders to install drainage, trench, excavate retaining wall, backfill, grade site, and prep for patio slab, all while college was still in session.
Contracted to Knappett Projects to excavate for foundations, retaining walls, and undergound utilities. Site preparation completed for curbs, gutters, and landscaping.
Contracted to Knappett Projects to excavate site, excavated for foundations, prepare site for underground utilities, backfill, base preparation, and parking lot preparation.
Contracted to Aral Construction to excavate for firemain backflow installation, sewer lift installation, sewer main installation, and manhole replacement. All completed while grounds open to the public.
Contracted to District of Hudson's Hope to clear site, and created gravel roadways, trails, campsites, and parking lots.
Copyright © 2024 Ramida Enterprises Ltd. - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.